Hello Costing gurus,
I have a small query, as per SAP price change for a material is possible if the material ledger period status for the current period is Period opened and no material movements.
But system is not allowing change through MR21, throwing error message saying current standard estimate exist, the material was costed last period and that period is close (status closing entry completed)
To the contrary system is allowing recosting and releasing a new cost estimate.
Any one know why its barring price change through MR21
thanks
Krishna