Hi,

User trys to perform a goods receipt usng MB01 101 and gets a message that the material they are using requires a Shelf Life Exp Date. The material was a SLED material at one time on the material master, but is no longer.

Why would the system still think this material is a SLED material?

Thank you.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 20, 2007 at 07:32 PM

    ALL SLED related data suppose to be clean from the material master plant data tab in SLED section then it will work fine.

    Goto OMJ5 and remove the SLED check for the plant and/or movement type

    Then you will not see the error

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.