on 09-19-2007 8:22 AM
I want to create a process order with order type PI01, but pop up window is shown to ask for sales order when using COR1. I suppose there is something wrong with material master setting, but I've never set classification to this material.
Please help.
Hi
I got the issue. Cause 'Material is configurable' is ticked in 'Basic view 2'.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
The strategy group of this material is set as 10
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nichole
Is the material assigned to any MRP group , if yes then check the config settings on t-code OPPR, if stg group is assigned. also check the matrial type to default MRP group assignment settings in SPRO>production>mrp>MRPgroup> Define MRP Group for Each Material Type.
regards
Prasad
reward if useful
Hi,
Pl. check the planning strategy in the material master.
Regards,
Senthilkumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Nicole
Check the strategy group field in material master MRP3 screen u might have given strategy as 20(make to order).
Regards
Prasad
Reward if useful
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
12 | |
10 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.