Skip to Content
avatar image
Former Member

Looping issue on two parameters in BPM model

Hello community users,

I am working on a NW BPM requirement where I have to assign the owner for a human task based on the combination of two variables which will be looped("Parallel for each") over the task. I have created decision table for the combination using BRM and call them in my "Potential Owner" Expression to get the owner. But when I create an instance, the owner assignment is not happening as per the decision table and there seems to be problem with the loop variables. The owner assignment is happening randomly, but when i check the context data its assigned properly for each loop instance. I need experts advise on how to model this requirement in an effective way so that I can overcome this issue.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers