HI FRIENDS,

CR10 SHOWS U THE CHANGE DOCUMENT FOR WORK CENTER.

I HAVE ALREADY TICKED THE CHECK BOXES IN OP40 TO REFLECT CHANGES MADE IN WORKCENTER TO THE DOCUMENT SHOWN IN CR10.

NOW MY PROBLEM IS WHEN I M CHANGING DATA IN ANY FIELD IN WORKCENTER ITS NOT GETTING REFLECTED IN CR10.

THE DATA IS GETTING REFLECTED ONLY WHEN I CHANGE RULE FOR STANDARD VALUE MAINTENANCE. (FIELD NAME-----VGMXX).

WHAT SHOULD I DO SO THAT DATA WILL REFLECT IN CR10 WHEN I CHANGE ANY FIELD IN WORK CENTER.

PLEASE GUIDE........

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Sep 17, 2007 at 10:13 AM

    Hi,

    As per SAP Help Library,

    <b><i>You also have to set the change document indicator in the <u>Data Dictionary</u> for each data element whose changes should be logged.</i></b>

    Regards

    Kannan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.