Hi,
We have an SAP SCM APO 5.0 system that comes with BI 7.0 by default. As per the concept, we have to extract the data in APO-BW to independent BW system and do reporting. The problem is the independent BW system is 3.5.
The questions for me are:
1. Are there any problems if we extract from a superior version(7.0) to an inferior version (3.5) and report on it?
2. We also have to send data from 3.5 system to 7.0 system. Any other problems to be anticipated?
Thanks.