Working on a project that is ruined where the client was not able to generate a single report.

could configure the entire data and could see the system live and running in the Quality server where every single report the client required is generated.

THE PROBLEM HERE IS

if i were to move the requests from the quality to the pre prdn the settings that were there earlier would be over written and could cause damage to the settings already done. for when i configured it anew, i did not check on what was existing and made amendments. i am having to move the data from quality to pre prdn for the client to sign off. how should i go about this.without disturbing the original structures. CAN SOMEBODY BE OF HELP PLEEEAASE ?