Former Member
Sep 15, 2007 at 01:36 PM

creation of production order without material reference

23 Views

Hi Guys,

Can anybody propose the solution for the following scenario :

When a raw material issued to a production order gets scrapped but at the same time that raw material which is scrapped can aslo be cut through some seperate operation and can be used for someother purpose later time for the same industry then in that case how to deal with the scenario????

Thanx in advance

Venkat