Skip to Content
author's profile photo Former Member
Former Member

Material Level batch management

how to configure materila level batch management,

batch number of the material starts with first 3 char of the materil

eg: computer = com001,

sum thing like this

tahnks and regards

madhu

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 03:02 PM

    Dear Madhu,

    for this you have to use EXIT_SAPLV01Z_001 or EXIT_SAPLV01Z_002. Please see documentation of this exits in SMOD or SE37 for details.

    Regards,

    Sabine

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.