Skip to Content
author's profile photo Former Member
Former Member

veiw Asset at plant level

HI,

Can you tell me how do I view the assets purchased for plants. I would also like to know how asset purchased for plant is booked at plant level.

What is the utility of plant field at FB50 posting screen. Can it be made mandatory, if so, how would it reflect in report. What priority it will have over cost centre and internal order.

Thankx

Anirban

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 12:49 PM

    hi

    You can use S_ALR_87011967 for checking the assets purchased for plants.

    You can see plant wise assets if you give plant while purchasing the assets. Moreover it is very much required field if there is PM module in your implementation. You can make it mandatory by making the plant field as required entry.

    See the field status group assigned to assets and go to obc4 then take the field status group assigned and in additional account assignments, you can make the plant as required entry.

    Radha

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 11:09 AM

    Hi

    Creation of asset time u can enter the plant.

    In reports nothing is difference.when we need see the reports at time u can execute only asset master level.

    ala

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 12:05 PM

    Hi

    To make plant a mandatory entry in FB50, write a validation

    Co code - Call point 2- validation -Activation level 1

    pre-requisite -> Company code =0001 and Transaction code = FB50

    check -> Plant <> '' (plant not equal to blank)

    Message ->type preferably E which should say Plant cannot be blank

    Assign points if helpful

    Rgds

    Asha

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.