I want to use a material in a plant as a raw material and the same material as a semi-finished goods in another plant.
Is is possible with same material no ?
Please explain me..
Regards
SR
Hi
Material type, you are defining at clent level.
you can not use like that as long as the material code is same.
Regards
YMREDDY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Renuka
I understand your scenario.
you are producing a material as semi finished in Plant2.
This material will be used as a component in a BOM of a product in plant1.
You can very well use material type as semi finished material in both the plants, provided my above assumption is correct.
In fact I came accross in many situations like this earlier.
I have used same as above.
Regards
YMREDDY