Skip to Content
avatar image
Former Member

CK11N alert:"Costing item 00001 is not assigned to a cost component"

Hi,

When I use CK11N, fill in all the necessary field, there will appear a alert.

The detail as follows:

-


Costing item 00001 is not assigned to a cost component

Message no. CK 334

Diagnosis

No cost component is assigned to costing item 00001.

System Response

The costs for the costing item are not shown.

Procedure

Go into Customizing for Product Cost Controlling and check the assignment of cost elements to cost components.

-


I have used KA03,KL03,CR03 to checked previous datas, but I find no errors?

What is the problem?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 12, 2007 at 09:02 AM

    Hi,

    In the cost component structure check whether the G/L a/c is included.

    Bye,

    Ramesh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 12, 2007 at 09:18 AM

    Hi,

    Use OKTZ to create cost component structure.

    Check for some of these settings also

    Configuration:

    Define costing sheets

    OKTZ create cost component structure

    OKK4 Define valuation variant

    OKKN Define cost variant

    Master Data:

    KP26 setup activity rates

    CR01 setup work centers

    MM01 setup material masters

    CS01 setup Bill of Materials

    CA01 setup routings

    Regards,

    Murali

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Mar 02, 2010 at 05:48 AM

    Solved by myself

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Ecco,

      I am getting same problem of "Costing item 00005 is not assigned to a cost component" But under cost component structure

      it is assigned already with chart of accounts, origin group, gl accounts with cost component. One GL account which is internal activity whose cost element categoty is 43 i.e, secondary cost element. This secodary cost element generaly does not come under chart of account which has alrady mentioned. Still it is showing as error during costing run through costing variant PPC4 while run from VA22(Quotation).. What will be the reason.. We have variant configuration material. So costing is done on configurable material.

      Best Regards,

      Samrat Roy