I use t-code CO01 to create Production order.At the first screen I select material 72 and plant HJW1 .At the Header creen,I input the data in the General tab and press return but the sap show the error message "No routing found".But I have create the routing for the material 72 and plant HJW1.I don't know why the sap found no routing.So my question was how to found the reason about why the sap can not found the routing and how to resolve this problem.Thank you.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Please check the validity and status of the routing in CA02

Regards

Ranga

Answers (4)

Answers (4)

Former Member
0 Kudos

Thanks all.I will review this question in the future.

Former Member
0 Kudos

Dear all.I have checked the status & the usage In ca02.But the error "No routing found" still exist.And I can not use the function "Read PP Master data" because the menu was disabled.

former_member196398
Active Contributor
0 Kudos

Hi,

You can find the Read PP Master Data" button active when you are in the Header - General data tab. It will be disabled if there are confirmations or Goods movements posted.

Regards,

Prasobh

Former Member
0 Kudos

Hi,

Please also check lot size range in routing for your header material. Is your production order qty within this lot size range. ?.

regards

pradeep

Former Member
0 Kudos

Hey,

Pls check if the routing u created has a status released in the header screen.

Ranojoy

former_member196398
Active Contributor
0 Kudos

Hi,

Probably you would have created the routing today, with valid from todays date. But the order you are creating may be with start date in past and system is not able to find and valid routing for the day.

I would suggest you to remove both the Basic "Start" and "End" and change the scheduling type to "Current date Scheduling", now enter. If system still not finding the routing, use the function "Read PP Master data".

Regards,

Prasobh

former_member184627
Active Contributor
0 Kudos

Hi,

Please check in T.code OPL8, choose your plant & order type & check if you have maintained the correct selection ID for the routing.

In the selection id check the status (whether it is created or release) & the priority.

In ca02, check the status & the usage (eg:production).

Regards,