Skip to Content
author's profile photo Former Member
Former Member

variant configuration

Hello sap gurus,

In variant configuration, i know how to create class,

then characteristics,

then configurable profile, and

maintain the price record for in vk11, va00 and in pr000.

These are the basic things in variant configuration.

But one company called and they need who knows variant configuration and they are expecting me to do variant configuration.

I kept 1 yr exp in variant configuration.

So plz give suggestion , whether to apply for this particular job on variant or to drop .

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 06:15 AM

    Yes you can But try to brush up your other areas also as VC is VAST topic

    Refer below url on some possible qustn on vc and be through with that

    variant-configuration

    Message was edited by:

    SHESAGIRI.G

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 12, 2007 at 06:22 AM

    dear robert

    here am sending step by step configuration of VC

    THIS IS FOR THE PLAIN VARIANT CONFIGURATION.

    Starting with creating a class

    The best naming convention is name the class same as the material name

    Let’s suppose your material name is NISSAN, create a class with name NISSAN of class type 300. Now coming to characteristics, name them as NISSAN_COLOR, NISSAN_CC.

    Creating class NISSAN

    Transaction code: CL04

    Look at the screen shot below

    Next go to the characteristic view.

    Add the characteristic NISSAN_COLOR. If the characteristic exits it will take it, else it will prompt you to create the char

    Say yes

    If you don’t want leave it as it is and creates the char for later just save it.

    Creating a characteristic: Transaction code: CT04

    Here is the screenshot for basic data

    Next enter the characteristic values

    Screen shot:

    We can look into this characteristic, if the characteristic is based on the dependency.

    There shouldn’t be any additional data for this. Now the characteristic is created. SAVE IT

    Now create another characteristic called NISSAN_CC

    The characteristic value view:

    he last characteristic value is the one which represents the variant condition field (vkond). Table is SDCOM

    You might need to look into this views with fields coz these are not same as that of the normal values. You don’t have any characteristic values for this characteristic. You assign the values in the dependency.

    Now you are done creating the characteristic for this class.

    I am trying to make this configuration simple without any classes of type 200.

    Ok now let’s start creating dependencies.

    Let the requirement be like this. For red you get options to select just 100 and 200, for blue you get to select 300 and for black you get to select 400. This doesn’t happen in reality, but I just wanted to show how it works.

    Transaction code: CU01

    Let’s create the first one

    NISSAN_OPTIONS_RED

    Remember when you start creating the dependency the status would be in preparation i.e., 2

    When you are done writing the code for the dependency change the status to 1

    Now click on the dependency editor

    Check the syntax: CTRL+F2

    Now save it and change the status to 1 before completely saving it

    Similarly create the options dependency for blue and black

    NISSAN_OPTIONS_BLUE, NISSAN_OPTIONS_BLACK

    Now let’s create dependency for pricing

    NISSAN_SET_PRICE

    Check for the fields which are selected.

    Now you are done writing the dependency for variant pricing.

    Now Creating configuration Profile

    Transaction code: CU41

    Configuration profile is where you maintain settings for a particular object. Object can be material, standard network or …. You may look into help for more information.

    I don’t have a material right now. Let’s end this here. I might create a material and show how you maintain the configuration profile.

    my sincere advice is dont depend on one company with one topic, breshup with all basics then this VC will become an added advantage for you.

    all the best

    rewards if it helps

    siva

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 06:24 AM

    hi,

    I think u know the basic steps in variant configurafion. nothing to worry about variant configuration follow this link

    variant" target="_blank">www.sdn.sap.com/irj/sdn/wiki">variant confi

    here goto erp operation-->u find vaiant confi

    in addition get pratice on all object dependencies or alteast on procedure(one type of dependencies).If u are on SAP 6.0 then it is much more simple. the variant configuration uses condition techquie here. I have not worked on it.

    my suggestion is get pratice & apply for the job

    regards,

    Arunprasad

    Message was edited by:

    arun prasad

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 12, 2007 at 06:25 AM

    Robert,

    Generally VC is done by PP Team ....But SD related things are done by SD Consultant...

    VC is very vast topic and you will have to closely work with ur PP Consultant for the same..

    Im sending U SD VC steps...

    Some light on Variant Configuration in Detail.

    The procedure is as follows:

    Create a Material - KMAT type with Item category (002)

    Create Charateristics in CT04 - Zbike, where in values mention the Color of the bile like Red, Blue etc

    Create another characteristics in CT04 - ZPrice, where directly go the additional data tab and maintain the table SDCOM and field VKOND (ABAP Dictionary it will ask for)

    Assign these two characteristics to a Class in CL01 - ZBikeclass ( Type 300) in characteristics tab page.

    Then go to CU41 Configuration profile select the material and enter the description click on the class assignment ie assign Zbikclass.

    Now go back to CT04 - enter Zbike -go to values- select Red- go to extras - Other Dependencies - Select Procedure enter in front 10 write - $self.ZPrice='Red' and save

    Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save)

    Now select Blue- go to extras - Other Dependencies - Editor - Select Procedure enter in front of 10 write - $self.ZPrice='Blue' and save

    Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save)

    Now go to VK11 - Enter VA00 (Condition)(For Std RVA001 Pricing Procedure) - enter variant Red and Blue give the rates accordingly and create the sales order.

    Variant configuration is used where you have a configurable material like computer (made up of components like processor, monitor, keyboard, mouse etc). These components are called as characteristics in variant config. Again this will be having values like processor can be either P4 or P3, monitor can be 15" or 17" etc.

    Based on the values selected the variant pricing will happen using the condition type VA00

    REWARD POINTS IF U FINDS THIS AS USEFUL...

    Regds

    MM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 12, 2007 at 06:36 AM

    hi

    the one thing i suggest u is be faithful inur approach and be brave and confident.. as long as u have faith inurself and confidence that u can perform well u always have ur chances..

    there is always risk in faking up but if ur confident enough on the level of subject knowledge u can give a try, and explain the interviewer that u dont have enough of working experience on the topic but u really do have gud subject knowledge.. based on that prepare urself for the interview.. always stick on ur word and be faithful in what u do defntly things will go ur way..wht ppl would look in a person is his buring desire to learn and implement, learning is one area which never comes to an end, and as long as ur learning u can acheive wht u desire for..

    have faith and first start believing urself.. by asking this question u have shown that ur not fully prepared for the task ahead of u.. first build confidence and then go ahead in a more faithful path.. if u really concentrate on the subject learning then i am sure u by urself can answer this question of urs...

    Search on the forum for Variant Configuration can get much of the info required...

    Thanx... Naren

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.