Hello,
I am getting a time out short dump when doing a cube to cube data load. The load seems to be having problems with something related to SID's but i am having problems troubleshooting it so i hoped someone would recognize my problems. I have been analyzing the data target in RSRV but havent gotten anything yet. Is there something specific i should analyze in RSRV other than the master data piece? Any other insights? Below i have pasted the excerpt from the short dump that seems relevant. Does this look familiar?
Thanks,
TMS
Information on where terminated
Termination occurred in the ABAP program "GP3VBUVSVKW4CKMEGUPKG6G8OVQ" - in
"VALUE_TO_SID_CONVERT_DB".
The main program was "SAPMSSY1 ".
In the source code you have the termination point in line 185
of the (Include) program "GP3VBUVSVKW4CKMEGUPKG6G8OVQ".