Skip to Content
0
Former Member
Sep 11, 2007 at 09:05 AM

Integration Testing on Business system to PI7.0

13 Views

Hi Experts,

Once the configuration done between ECC6.0 system to PI7.0

how do i check on (Data Side) i mean how to transfer the data from ECC6.0 to PI7.0.

I dont know how to check

1)Design the required Interface objects in IR of XI and it should be shown in ECC 6.0 on running the TA SPROXY.

2)Check that the Integration Repository is running and data is maintained there.

please guide me how to do this.

Thanks&Regards,

Siva