Bills of material[BOM]

Dear all,

hi, i have got a dought in bills of material, i shall be very much pleased if some one helps me out of this.

using the transaction code CS01, i have created the 'BOM' for the material 'computer' giving the components as 'keypad' and 'CPU'. after creating the required thing i have saved the data.

later on when i tried to creat a sales order using this data, the components are not getting displayed in the sales order.

what i have to do to get the components displayed in the sales order.

please do help me out.

Regards,

Sushmitha.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • avatar image
    Former Member
    Sep 11, 2007 at 09:01 AM

    Hi,

    Go to material master MM02 and check in Sales org 2 screen whether you have maintained Item Category group as ERLA or LUMF for the main item.

    Regards

    Ali

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 11, 2007 at 09:03 AM

    hi,

    pls check the item catergory group of the material "computer" it should be ERLA. in the transaction code MM02

    pls reward points if the answer is helpful

    REgards,

    Murali

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 11, 2007 at 09:05 AM

    Hi,

    In Item category VOV7 u need to assign 'A' to Structure scope.

    Sam

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 11, 2007 at 09:06 AM

    Susmitha,

    below is whole process for sales BOM-

    Sales BOM Implementation

    A bill of material (BOM) describes the different components that together create a product. A BOM for a bicycle, for example, consists of all the parts that make up the bicycle: the frame, the saddle, wheels, and so on.

    Process Flow

    When you enter the material number of a bill of materials that is relevant for sales order processing, the system displays the material that describes the whole bill of materials as a main item. The individual components are displayed as lower-level items.

    There are two ways to process a bill of materials in Sales. Once you have entered a bill of material in a sales order, the system runs pricing, inventory control, and delivery processing at:

    - Main item level if the material is assembled, or

    - Component level if the material is not assembled

    The type of processing used by the system is determined by the item category group that you enter in the material master record for relevant materials.

    Processing at Main Item Level

    If you want the system to carry out pricing, inventory control, and delivery processing at main item level, enter ERLA in the Item category group field of the Sales: sales org. 2 screen in the material master record of the finished product. This means that the components only function as text items and are not relevant for delivery. The following graphic shows how a bill of material is processed at main item level.

    Processing at Component Level

    If you want the system to carry out pricing, inventory control, and delivery processing at the component level, enter LUMF in the Item category group field of the Sales: sales org. 2 screen in the material master record of the finished product. In this case, only the components are relevant for delivery. During processing the system automatically creates a delivery group. The latest delivery date among all the components becomes the delivery date for the entire delivery group.

    REWARD IF U FINDS THIS AS USEFUL...

    Regds

    MM

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 11, 2007 at 09:07 AM

    Check the settings in the itemcategory TAq structruscope field maintain B and also maintain ERLA IN THE MM01