Recocile SC Challan

Hello Friends,

when I reconcile SC challan with ref. to GR documents system only showing order material system is not showing issues material to vendor and when I enter relevant SC Challan no.system give me messege.<b>Challan material is different from material document</b>. Please suggest me what i have to do?

Regards,

Chetan

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 10, 2007 at 11:23 AM

    Please check the imward and ooutward movement type on SPRO.

    Outward movment could be 541. Whereas inward movmenet type could be 543 O.

    Hemant

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 10, 2007 at 12:13 PM

    Hi,

    Pl. check the material sent to your vendor is maintained at J1ID table. It is possible that when you dent the material to your vendor, the material entry was there at J1ID, but till the time processed material is received, this entry has been deleted by someone. In this case, you will get the error as material in S/C Challan is different than the GR material.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.