Hi all
I am looking to create absence records in IT2001 for future dates. The absences are linked to absence quotas and normally when creating an absence record, the quotas in IT2006 are reduced automatically and straight away. How can I still have the IT2001 record created, but not have the IT2006 quotas reduced until the day of the absence arrives.
If someone could guide me through how to achieve this it would be great.
Thanks
PS