cancel
Showing results for 
Search instead for 
Did you mean: 

confirmation

Former Member
0 Kudos

dear all,

what is the difference between <b>automatic final confirmation</b> and <b>Final confirmation</b> in co11n

thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

automatic final confirmation, the confirmed quantity of the operation or the order (yield qty + rework qty + scrap qty) determines whether the confirmation is saved as a partial or final confirmation:

If the confirmed quantity is less than the quantity possible, the confirmation is saved as a partial confirmation.

If the confirmed quantity is more than (that is, greater than or equal to) the quantity possible, the confirmation is saved as a final confirmation.

The quantity possible corresponds to the planned operation or order quantity, or to the confirmed yield of operations that have been finally confirmed, provided that finally confirmed operations exist.

Answers (0)