Skip to Content
avatar image
Former Member

Usage for Inspection plan and Stability Notification

I have following two queries:

1. What usage needs to be assigned in Inspection plan for stability (QM Module)? 3 or 9

2. After creating initial inspection lot from the notification (qs), I am unable to record results and process physical samples. I am getting the message " Processing can only be performed using the stability study notification"

Please guide

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers