Skip to Content
0

Usage for Inspection plan and Stability Notification

Sep 05, 2017 at 02:05 PM

30

avatar image
Former Member

I have following two queries:

1. What usage needs to be assigned in Inspection plan for stability (QM Module)? 3 or 9

2. After creating initial inspection lot from the notification (qs), I am unable to record results and process physical samples. I am getting the message " Processing can only be performed using the stability study notification"

Please guide

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers