on 09-07-2007 12:00 AM
Hi Experts,
Is there a way to implement ATP with finite capacity availability and material availability in a Make to stock (MTS) environment in R/3? In other words, when a sales order is created for a material, the confirmation date that is recd. should be based on Capacity and Material availability. What planning strategy would you use?
I understand that this can be implemented in assembled to order environment (planning strategy 82 or 83), but my question is more related to MTS environment.
Regards,
Praveen
Hi ,
Availability check is carried out during sales order processing
Materail requires availability check it needs to be done as follows.
In the Availability Check field on the Gen./Plant tab page in the material master,
enter which and/or what type of availability check should be carried out for this
material during order processing.
The material availability date is determined from delivery scheduling. On this
date, enough material has to be available in time for delivery to the customer for
their requested delivery date.
The system calculates this date, working backwards from the customer's required
delivery date.
The system calculates the time required for picking, packing, loading and
transporting the goods.
Availability check is carried in the following three ways .
1. Customer-Material Information
2. Ship-to party customer master record
3. Material master record
Sail
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
105 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.