SAP SCM 7.1 IDES installation Error at ' Import ABAP' phase

Dear Friends,

I was trying to install SAP SCM 7.1 IDES in the Local system where I already have ECC 6.0 Ehp 6 installed. At the time of 'Import ABAP' Phase I am getting the below error. Could you please help!

Process call 'E:\usr\sap\WM1\SYS\exe\uc\NTAMD64\R3load.exe -testconnect' exits with error code -1073740791

- During installation system asked Oracle 10g client ---> Provided oracle 10.2 client

***********************

Already Installed

- Oracle 11g database

- ECC 6.0 Ehp 6

*********************

kindly guide me the steps to follow for installation and how to use same IP with different instance to have RFC connections between ECC and SCM system.

Do we need to change the host file entry ?

Regards,

Yogi

error.png (91.6 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 08, 2017 at 02:32 AM

    Hi,

    I followed this and activated the listener and it worked

    https://archive.sap.com/discussions/thread/1412246

    Thanks !.. I am closing the thread.

    Regards,

    Yogi

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 29, 2017 at 09:46 AM

    Dear Yogi,

    please execute R3load -v and send the result.
    Also, is this E:\usr\sap\WM1\SYS\exe\uc\NTAMD64\R3load.exe the correct one?
    If possible, upload the sapinst_dev.log from that installation.

    Hendrik