on 08-24-2017 7:32 AM
Hi Expert,
Could you please provide me the steps to Synchronize SAP PO bpm from Development Infrastructure to NWDS?
Thanks,
Chandar
Jun has answered to your questions.
1. Please have a look on this guide.
2. About handling the DC that you will synchronize have a look on this document:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Milen,
thanks for the links. but my current issue is, I am not able to find the componet browser to synchronize bpm object.
Developed bpm and iflows in DI system. Now I want to download it to my local NWDS tool. Could please provide me the steps to dowload/synch the pbm flow to my local NWDS tool.
Its helpful if you can provide me docs for transport steps for nwds object.
Thanks,
Chandar
connect to nwdi
download development configuration
click the bpm dc and select "create project"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I don't really get what you are trying to do. Can you explain that a bit more detailed?
/Tobias
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
11 | |
9 | |
7 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.