Hi Experts,
I have installed ECC 6.0. I have added PI 7.0 (XI) component also. i have done postinstallation steps of SLD using the NW7 installation Guide MAXDB and functional testing was done everything is successfull now i need to configure the PI 7.0 to other system ECC 6.0 . please forward those steps which are required to build for (exhange the information) from PI 7.0system to other system
Thanks in advance,
Siva.