Hi gurus, i need suggestion how to manage this process.

A single operator perform the setup on different machine in the shopfloor. Each machine is a resource in APO (and a WC in ECC). This is a constraint because, being only one person, the setup on different machine cannot overlap.

The second constraint is that, on the same resource, there are setup optimization logic based on the raw material used for production. This is archived using the setup matrix.

I'd like a suggestion to manage this process. The setup on different resources cannot overlap due the first constraint, and i have to run the setup optimization (optimizer available in APO) on the single resource.

Thanks.

M.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Best Answer
Matteo . Aug 28, 2017 at 09:40 AM
0

any suggestion?

thanks