Auto confirmation of PO with delay

Hi,

When I create STO between two plants SAP automatically creates confirmation (ab-line) after saving.

The problem is when I need for some reason change the qty after saving. I cannot change it on confirmation line or on item line. If I try to delete the confirmation line and change the qty after that SAP automatically creates a new AB line.. Could there be some way to add some delay to that automatic confirmation? So that I could cancel AB line and after saving change the qty on item level?