on 09-02-2007 10:00 AM
Can a production order be assigned to an internal order so that the manufacturing costs can be seen in the internal order?
My scenario is such that I want to manufacture sheet metal dies. The various costs involved are design costs, procurement costs and manufacturing costs. The design costs and procurement costs will be captured in the internal order. I want to capture the manufacturing cost through the production order.
Now the problem is how can I see the total of all three costs in the internal order?
Thanks in anticipation.
Sumeet
As I know,
You can assign internal order as a settlement receiver. Since production order itself is a cost receiver.
Why connot you use internal order instead of production order. You can do GR/GI to internal order.
One more option is you can use cost centre/internal order as a receiver, maintain a minimum price (1unit=1$)in production material and when you settle all the cost will be settled against the cost centre/internal order.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can do the setting for settlemt profile in OKO7
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.