Assignment of Production Order to Internal Order

983 Views

Can a production order be assigned to an internal order so that the manufacturing costs can be seen in the internal order?

My scenario is such that I want to manufacture sheet metal dies. The various costs involved are design costs, procurement costs and manufacturing costs. The design costs and procurement costs will be captured in the internal order. I want to capture the manufacturing cost through the production order.

Now the problem is how can I see the total of all three costs in the internal order?