Skip to Content

Profit Center Substitution in GGB1 for BSEG in MB1B

Hi,

After using T Code: MB1B and movement type : 413 E

The only prerequisite that i have maintained is as follows:-

SYST-TCODE = 'MB1B'

The profit centers in the Debit & Credit are picked based on the master data of the material.

I have provided a constant value in the assignment field and profit center.substitute.pngcapture.png

As you can see in the screenshots, the substitution is working for Assignment field, but it is not working for profit centers.

I am assuming that the system is taking priority of the master data over the substitution.

Is there a way in which the substitution would take a higher priority.

Regards,

Gavin Monteiro.

substitute.png (16.6 kB)
capture.png (11.0 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Aug 23, 2017 at 09:32 AM

    Hi,

    Have a look at this OSS note:

    644682 - MB1B: Manually entered Profit Center is not saved

    Regards,

    Eli

    P.S. For general logic of Profit centre determination in such cases, consult OSS note

    978159 - Problem with profit center determination

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.