on 08-29-2007 5:54 PM
hello Friends,
Please help me with report painter? how can we use? please give me one nice example.
Please provide me extra documents.
thank you
Hi KP
You can use report painter for simple reports. There are diff ways of using this tool
If you are starting a new report altogether from scratch
1) First ensure the characteristics and key figures u need are available in the library from the reports are to be designed
2) Once you modify the library with the required characteristics and key figures go to either creation of report or copy the existing report. Take a reference report
3) Once u copy the structure of the existing report define your columns
4) Define your columns say - CC expenses in co currency etc.
5) Define your vaiables in the report - here u can take a drop down and select let's say - Plan values or actual values
6) After defining the parameters the important thing is general data selection
Here u will select Ex, Controlling Area, Company code, Period etc
7) Save and execute report
The above are macro level steps - with the above inputs u can explore possibilities available and create ur own report
You can also create your own library copying the existing one and proceed with report creation
Remember after creating the report u need to assign the report to a report group (either existing one) or u can create ur own report group and assign your reports to the group
Hope the above helps, Please assign points as a way to say thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi KP
Ex. Take the standard CC variance report and copy this report and just practice by changing
1) Characteristics
2) key figures change to values in object currency - if u hv two diff currencies
3) Change general data selection parameters - remove expand radio button if it is there or select it if it is not there
4) Errors - when u create report first time - general error could be general data selection missing.
5) At every place u hv check points and check ur report creation process through out. Click on check and confirm buttons
6) At the top u hv check option thru which u can check ur report for list of errors
You try this out for preparation for the interview
For interview the steps i defined in earlier message should do
Remember some libraries - like CCSS is for cost centers, 1SIP is the report group for cost center variances.
Hope the above helps - pls assign points as a way to say thanks
Hello KP,
For complete the previous information that you already had, I´ll send you a link to a documentation for create a report painter:
http://help.sap.com/saphelp_erp2005vp/helpdata/EN/5b/d22dc343c611d182b30000e829fbfe/frameset.htm
Good luck for the interview!
Kind regards,
Mary Jane
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.