Rounding of material quantity in order

Former Member
0 Kudos

Hi All,

I am using material whose base unit of measure is KG & unit of issue is gm in material master. This is externally procured material with rounding value 0.500 in MRP1 screen. No rounding profile maintained in material master.

But when I create planned order for another material, in which above material used as component. Quantity of this material is rounded off to 0.044 kg instead of 0.04305 kg.

Can anyone explain how this happens.

Thanks in advance.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Suhas,

I had already discussed this issue with ABAP consultant, as per him you can not change setting to 4 or 5 places after decimal point.

This is standard SAP setting.

Best Regards.

Former Member
0 Kudos

Hi Avinash,

This is the setting which to be done in the SPRO but its better not to change the standard setting in the CUNI transactions. Better you can create one more Unit or measurement with same like tat and increase the decimal places.

Thanks and Regards,

Satish

Former Member
0 Kudos

Hi Bala,

Thanks alot for your inputs.

Can you please tell me if required quantity of material is 43.01 gm then system round the value to 0.043 kg. But when the required value is 43.02 gm system rounds it to 0.044 kg.

Why system rounds the value to next higher value & if I want value to be replicated in process order as 43.02 gm then what are the settings needed.

Thanks in advance.

Former Member
0 Kudos

Hi,

In your system decimal places are set for 3 digits, So with the help of ABAP consultant increase it up to 4 or 5 digits so that you will get required result.

Regards,

Suhas

Former Member
0 Kudos

Hi Avinash,

This is not due to rounding value you have maintained.

In SAP only after decimal only it will consider 3 decimals only. i.e means it will round the value more then 3 decimals to last digit.

Thanks

Bala