on 08-28-2007 10:51 AM
HI sapiens
Can anybody help me regarding the entries passed when
1. WIP caliculation
2. Settlement
3.Variane caliculation
I request you to give me for each entry wether it is a P&L gl account /Balance sheet gl account
If it is p&L account cost element is required or not
I would be thankful to you
Cheers
Vani
Hi Vani
Following are the entries passed
WIP Calculation - This depends on order status. WIP is calculated only for orders with REL, PREL status
Entry
Dr WIP - Balance Sheet Item
Cr Change in stock WIP - Cost Element
During settlement
If the order status is DLV or TECO
WIP entry as outlined above gets reversed and varainces are calculated. Variances are calculated during variance calculation step
It is only during settlement that FI entries are passed for
1) WIP
2) Reversal of WIP
3) Posting for Variances
You need to create 2 variance accounts as follows assuming u hv SFG and FG Matl
1) Variances in Production - Cost Element
2) Variances FG Prodution - Not a cost element
3) Variances SFG production - Not a cost element
The postings are done thru OBYC settings for variances and for WIP the accounts the defined in WIP Configuration - Define posting rules for settling WIP
Hope the above clarifies - pls assign points as a way to say thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vani,
Any costing related element should be created as cost elements. In your case , you need to create this elements as secondary cost elements.
Hope this solves your problem. Assign points as way of thanks.
Thanks
Dasa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.