cancel
Showing results for 
Search instead for 
Did you mean: 

Technical error (smw01): Initial Load Bupa Main CRM to CDB

Former Member
0 Kudos

hi ,

The BUPA_MAIN messaging bdoc contains the following error in transaction

SMW01, in initial load CRM to CDB.

Technical error occured: Service , BDoc type CAPGEN_OBJ_WRITE, Message Creating realignment job in REALIGN queue failed.

Nº mensaje: SMW3019

Service that caused the error: BP_MAIN_CRM_TO_CDB

Nº mensaje: SMO8047

Somebody knows like solving it?

Message was edited by:

Meifo

Message was edited by:

Meifo

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

go to transaction : genstatus.

Double click on the red traffic light line item.

Select all the entries in generate all.

Try to download the BP.

Best Regards,

Pratik Patel

<b>Reward with Points!</b>

Former Member
0 Kudos

Hi,

I have reviewed all the steps that have commented to me, These estan well but it follows the error

thanks

former_member192750
Active Contributor
0 Kudos

Hello Meifo,

Please check the SAP note 315222. The error probably caused due to incorrect number range specification.

Best Regards,

Ankan

Former Member
0 Kudos

Hi Ankan,

Your answer is correct, but the allocation of points does not appear in your post As I can asign your points?

Message was edited by:

Meifo

Former Member
0 Kudos

1. Check if you have generated all Bdocs (smogtotal)

2. Check if your Mobile Briged is active

3. Check in transaction SMOHQUEUE if the Queue Daemon is running