what are the things to be tested in sap xi server before going to use th

1) what are the things to be tested in sap xi server before going to impliment first interface?

2)what are prerequisites to be configured in xi server before implementing first interface?

ragards

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • Best Answer
    author's profile photo
    Former Member
    Aug 22, 2007 at 03:09 PM

    Hi

    You have to create TRFC and Partner profiles pointing Towards R/3 System.

    Check HTTP connections.

    Reward points if found helpfull...

    Add comment
    10|10000 characters needed characters exceeded

  • author's profile photo
    Former Member
    Aug 22, 2007 at 03:10 PM

    Hi Dhanush,

    >>>>><i>1) what are the things to be tested in sap xi server before going to implement first interface?</i>

    >>>>><i>2)what are prerequisites to be configured in xi server before implementing first interface?</i>

    For both of your question the answer would be

    1. Check all the Post installation configuration has been done properly, with the help of the following links

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b

    http://help.sap.com/bp_bpmv130/Documentation/Installation/Configuration_Guide_FP.pdf

    2. Make sure the latest BASIS Component have been imported into your design time environment

    After this you can start developing your first interface

    Regards

    Ramesh P