Skip to Content
avatar image
Former Member

BPM Impementation Question

I have a scenario where I want to do the following:

Receive a Sync interface

Split this into multiple different other sync interfaces to be sent to different receivers

map responses of these sync steps back to the original sync message but the response side of it.

I initially had the idea of

Receive: Sync Interface

Transform: Split to multiple sync intefaces

Sync send steps for each sync message which has been split

Transform: Reponses from previous sync send step into response for original sync message

Send: Response message back to original sync sender

Now I think there may be an issue here... Namely the fact that the receive mode can only be Async or Opens S/A Bridge.

I have tried with the Opens S/A Bridge but either I have configured something wrong or this is not the way to complete this scenario.

Could someone shed some light and let me know how this should be implemented or tell me that what I am doing is right and I then need to go back try to solve the issue with what I have done already

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Aug 22, 2007 at 01:31 PM

    Hi,

    The option Open SA Bridge is the Correct One .

    In the final send step where you want to send the response, you select option Closes SA Bridge.

    Can you let us know what the error / issue is?

    Regards

    Bhavesh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 22, 2007 at 01:41 PM

    Hi bhavesh... that is actually what ive done but I run into some issues....

    Could it be because in the transform step I am mapping from the original sync message to another syn message and it should be to an async message type?

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Bhavesh Kantilal

      By the way I am doing the 1:n mapping and I then follow it by multiple sync send steps... one for each message is this correct?

      You see the other thing is that I will only ever have one sync send step executed so I will only ever need one to one mapping on the response and to do this I have multiple transformation steps one to map each response to the original sync message