cancel
Showing results for 
Search instead for 
Did you mean: 

PGI not getting done.

Former Member
0 Kudos

Dear Friends,

I am going to deliver a back dated delivery (in the order also changed the document date in the header and in delivery Actual GI date), while doing PGI system is showing the below error:

Deficit of BA Unrestr. prev. 8.638 TO : 95109410111 TPST ST00 1

It is a batch material, availability check-KP(no check), material is available (checked in MB5B with back date), (here in the error 95109410111 is mateirl code, TPST is plant and ST00 is storage location and 1 is batch number)

Please give me solution how to overcome this error.

Regards,

Sreehari

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Sreehari,

The error says that for the below given comination,there is no stock.

That means when you would have done MIGO then the stock was not received for the combination of plant tpst ,storage location st00 and batch number1.

You can also transfer the stock from one storage location to another using MB1B and the proper movement type.

Reward points if it helps.

Regards

Karan

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

check whether the available material is with the same batch number

regards

prashanth