cancel
Showing results for 
Search instead for 
Did you mean: 

The price for material XXXXXXXX will be negative

Former Member
0 Kudos

Hi Dear ALL,

While Iam trying to do the PGI (vl02n)for return PO item after delivery(vl10b). System throwing the error as mentioned below.

Mat price control V and Mat ledger activated.

Please any one can help how to solve this issue.

BR,

NJK

The price for material XXXXXXXX will be negative

Diagnosis

The system calculated a negative moving average price for the material.

System response

The moving average price is set to zero for materials with price control S.

Processing is terminated for materials with price control V, because the system is not set up to handle negative prices for such materials.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Material we are activated matterial ledger due to here we have two currency comp code and group code currrency.

We are uploaded material price for CC.not for group code currency. So this is reason system throwing material price negitve.

while doing PGI..

Former Member
0 Kudos

Hi,

I hope your System is activated to Material Ledger.Then we need to maintain as per the SAP Best Practice , to maintain the price at the standard Price, to get the actual costing and to attain the periodic Unit Price and the Variances of the same.

Regards,

Gangadhar

Former Member
0 Kudos

Thank you for input.

Here my question is now we need to change price control V to S?

Can explain me briefly how to fix this issue pls.

Thanks again.

Former Member
0 Kudos

Hi

Plz check the following OSS Note(703604) and it will help you in the change in the material price control.

Regards,

Gangadhar