batch: lobm_rlz_proz

Former Member
0 Kudos

Hi

how does the system calculate the percentage remaining shelf life, i want to use standard charactersitics <i>lobm_rlz_proz</i>, for lobm_rlz the system calculates remaining shelf life based on delivery date and expiration date, so i can get remaining shelf life in days, but to get percentage remaining shelf life , what dates does the system consider for the start date of the batch ( i cannot maintain total shelf life and remaining shelf life in material master record - plant data/stor location view) while creating batches we populate the expiration date, so i can get sled and if needed i can also populate available from date, so iam wondering how standard SAP calculates percentage remaining shelf life with standard characteristics <i>lobm_rlz_proz.</i>

sam

Message was edited by:

sam litecky

Message was edited by:

sam litecky

Message was edited by:

sam litecky

Message was edited by:

sam litecky

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

thx