on 08-21-2007 7:18 PM
Hi
how does the system calculate the percentage remaining shelf life, i want to use standard charactersitics <i>lobm_rlz_proz</i>, for lobm_rlz the system calculates remaining shelf life based on delivery date and expiration date, so i can get remaining shelf life in days, but to get percentage remaining shelf life , what dates does the system consider for the start date of the batch ( i cannot maintain total shelf life and remaining shelf life in material master record - plant data/stor location view) while creating batches we populate the expiration date, so i can get sled and if needed i can also populate available from date, so iam wondering how standard SAP calculates percentage remaining shelf life with standard characteristics <i>lobm_rlz_proz.</i>
sam
Message was edited by:
sam litecky
Message was edited by:
sam litecky
Message was edited by:
sam litecky
Message was edited by:
sam litecky
thx
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.