on 08-21-2007 3:39 PM
Hi,
I'm trying to use LQ02 to trigger posting change from WM to IM for Unrestricted to Block using movement type 309. The ref. movement type used for IM is 344. However I kept getting error message saying "No Ship-to party defined in Table T321 for ref.movement type 344"
I checked he OMLR configuration and I can see that the 'Ship-to party" field is blank and is no-changeable. Why is the system looking for this piece of information?
Thanks.
Tracy
Tracy
I am not sure but I would think that IM is confused as to what you want to do.
309 is a generic movement type in WM as the decision is normally made in IM and therefore 309 is fine but how does IM know you want to do a 344 if you use 309 as this movement type is normally the reference mvt type for 309, 321, 322,343 etc etc
I hope that this is of use
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Assumed answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.