cancel
Showing results for 
Search instead for 
Did you mean: 

urjent

Former Member
0 Kudos

hai experts,

iam trying to post a material in mb1c tcode system displays a error message

tht is material is not created in warehouse 001

plz give me solution

points to be rewarded for helpful answer

thanks&regards,

sravani

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

MB1c is used to add stock for the material..

check for the warehouse no. which u have assigned for the material while creating the materail

goto mm02 and try changing the warehouse no..

Reward if USeful

Thanx & regards.

Naren

Answers (8)

Answers (8)

Former Member
0 Kudos

Hi,

Go to IMG - enterprise structure - assignment - logistics execution - assign warehose number to plant /storage location. Just check whether you have assigned any warehouse to your plant.

Reward points if solution helps.

Regards,

Allabaqsh G. Patil

Former Member
0 Kudos

hi

goto mm50 and extend the warehouse view and maintain the material with ware house 001 in MM02 and then do MB1c

regards

prashanth

Former Member
0 Kudos

Hi Sravani,

I think WHM is active in your system.

Try extending your material to Warehouse mgmt 1 , Warehouse mgmt 2 views by going to MM01.

Then you try MB1C please.

Reward if it helps.

Regards,

Gaurav Raghav

Former Member
0 Kudos

Hi Sravani,

Extend the material by using MM01 and add the WH view and then try MB1C.

Regards,

Vinod

Former Member
0 Kudos

Hi,

Just check that you have created material in Warehouse 001. Also check the relevant assignments to warehouse in Enterprise Structure > Assignment >....

This will solve your problem

Regrads

SD

Former Member
0 Kudos

let me know against what ur trying to do GR.

We have several options for this and against what Movement type ur trying to do this.

u can make scrrens shots of ur porcess and send to my mail id i can so that i can help u out.

jaganath_asian@rediffmail.com

rgds

bj

Former Member
0 Kudos

Hi

goto MMRV and check the current period.

If the posting period 07 then goto MMPV and open the current period i.e is 08 month and 2007

Former Member
0 Kudos

Hi

I hope you have created Warehouse no and it also been assigned to your plant, so goto Enterprises Structure, Assign, logistics Execution, assign plant to warehouse no. , and then delete the assignment.

If you do delete the warehouse assignment, then you do the transfer entry.

Reward if it helps

regards

Prasanna R