In t code MCRE material usage analysis what is the difference between Requirement Quantity and Withdrawal quantity.?

Regards

Sandeep

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

4 Answers

  • Best Answer
    Posted on Aug 21, 2007 at 06:57 AM

    Dear Sandeep,

    1.<u><b>Requirement Quantity</b></u>

    Quantity of material components needed to produce the expected order quantity.

    Use

    In the standard Shop Floor Information System, this key figure is calculated when a material usage analysis is carried out. It is then updated in the information structure S026.

    <b><i><u>So this is the total of your BOM item's quantity.</u></i></b>

    For making A let's assume B - 2 quantity & C 2 quantity is required.

    So the requirement quantity for making 1 A is 4.

    2.<u><b>Quantity withdrawn</b></u>

    Quantity of a component withdrawn when a goods issue is posted for a production order.

    Use

    In the standard Shop Floor Information System, this key figure is calculated when a material usage analysis is carried out. It is then updated in information structure S026.

    Suppose you have consumed 3B & 2 C for making 1 A,then in the withdrawal

    quantity it will be showing as 5.

    I hope this will give you some idea.

    Regards

    Mangal

    Add comment
    10|10000 characters needed characters exceeded

  • author's profile photo
    Former Member
    Posted on Aug 21, 2007 at 06:50 AM

    Hi Sandeep

    Requirments quantity is the quantity of the components in BOM & withdrawal quantity is the actual component quantity consumed while doing confirmation(CO11n) or in MB1A or in MFBF while doing production booking.

    regards

    Prasad

    Reward if useful

    Add comment
    10|10000 characters needed characters exceeded

  • author's profile photo
    Former Member
    Posted on Aug 21, 2007 at 06:58 AM

    HI Sandeep,

    Requirement qntys means planned qnty which is calculated from BOM

    Withdrawal qntys means actual qnty consumed, when you do GR , it can be Auto GR, Manaul GR.

    Thanks

    Bala

    Add comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 21, 2007 at 06:53 AM

    Hi

    Requirement qty : The qty requirement in the production order for the material as per BOM

    Withdrawal qty : The qty that is entered in during confirmation (Actual consumption)

    Regards,

    Ramasamy