Passing Custom fields to Req and PO

Hi,

We are on SRM 5.0 and ECC 5.0.We are using the classic scenario .I am trying to transfer the catalog ID from SRM shopping cart to R3 Req .There are number of threads in this forum that describe the procedure, which i understand.

But now if the Req is converted to PO in R3 either manually or auto, does the custom fields also get transferred automatically ,if i maintain the same custom fields in CI_EKPODB & CI_EKPODBX? or is there anything else i need to do.

Thanks

Raghu

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Aug 21, 2007 at 12:51 PM

    Thanks Atul and Yann.

    As i mentioned i am on SRM 5.0 and ECC 5.0. The badi i am using in SRM is BBP_CREATE_BE_RQ_NEW. This is the recomended new BADI in SR> 5.0 release notes.The structure here is different.

    See my code below in SRM system in BADI implementation of BBP_CREATE_BE_RQ_NEW.

    DATA: s_item_sc TYPE bbp_pds_transfer_item,

    s_extension TYPE bbps_badi_extension.

    DATA: v_item_no(5).

    LOOP AT is_sc_document-item INTO s_item_sc.

    s_extension-structure = 'BAPI_TE_REQUISITION_ITEM'.

    v_item_no = s_item_sc-number_int+5(5).

    CONCATENATE v_item_no s_item_sc-catalogid

    INTO s_extension-valuepart1 .

    CONDENSE s_extension-valuepart1 NO-GAPS.

    APPEND s_extension TO cs_rq_document-it_extensionin.

    ENDLOOP.

    I guess SRM system calls an RFC and creates PR using BAPI_PR_CREATE.I am hoping the above works as i have not yet tested.

    Now, what i am looking for is ,assuming that the above works fine and the field is passed to the R3 PR from SRM. How do i pass this to the followon document which is the PO.I know i need to append CI_EKPODB & CI_EKPODBX. But i don't think i need to use BBP_CUFMAP.I guess this is for the old BADI.

    Guys, let me know if my approach is wrong.

    Regards

    Raghu

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Yann Bouillut

      The below is the code i the method PROCESS_ITEM in BADI ME_PROCESS_PO_CUST

      DATA: ls_mepoitem TYPE mepoitem.

      CLEAR : ls_mepoitem.

      ls_mepoitem = im_item->get_data( ).

      ls_mepoitem-zzcatalogid = 'ABCD123'.

      im_item->set_data( ls_mepoitem ).

      When i run the transaction ME59N to convert a PReq to PO automatically.I get the error,

      PO could not be created.

      PO header data still faulty.

      Data from Business Add-in ME_PROCESS_PO_CUST not transferred

      Requesition could not be created.

      But when i comment the line " im_item->set_data( ls_mepoitem )" in the BADI and execute ME59N again. It works fine.

      Any ideas??

      Thanks

      Raghu

  • avatar image
    Former Member
    Aug 21, 2007 at 06:59 AM

    Hi

    Besides BBP_CUFMAP, you have to of course :

    - create the same Zdata element datain ECC as you have done it in SRM.

    - maintain CI_EKPODB with append of your Zdata element

    - create CI_EKPODBX and activate it !

    Then you will be able to sea your Zdata element (or CUF) in the EKPO table.

    You don't need to use BBP_PO_INBOUND !

    update-custom-fields-in-po-bbpecspooutbadi

    mapping-fields-in-srm-with-r3

    <u>Also, Please refer to SAP OSS Notes 672960 and 485891.</u>

    <b>The BADIs in SRM which can used in this case, using transaction SE18 are </b>

    <u>BBP_TARGET_OBJECTS</u>

    <u>BBP_TARGET_OBJTYPE</u>

    <b><u>In SRM Customization</u></b>

    In the following step : " Go to SRM --> SRM Server --> Cross Application Settings --> Define Objects in Backend System --> go to external procurement and select the function from the drop down box", it says "purchase order if item data is complete, otherwise Purchase Requsition.

    <b>Related links for source code and other configuration -></b>

    R3 field is not populated????

    implementation of BADI BBP_ECS_PO_OUT_BADI in SRM. and BBP_PO_INBOUND_BADI

    custom-field-values-are-not-being-transfered-to-th

    custom-field-values-not-passed-to-r3

    Do let me know, incase you face any issues.

    Regards

    - Atul

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 21, 2007 at 07:06 AM

    Hi,

    No the CUF field in PR is not automatically transfered to PO.

    For this you have to implement ECC badis :

    ME_PROCESS_PO_CUST to transfer PR CUF field to PO CUF field

    ME_GUI_PO_CUST if you want to display and control the cuf data in the PO (additional tab)

    Kind regards,

    Yann