on 08-20-2007 2:24 PM
Hi all,
From the Production perspective, I need a report from the system which contains following fields,
1 Order
2 Planned prod. Qty
3 Actual Prod Qty
4 Planned time reqd.
5 Actual time reqd.
6 Variance between time reqd.
First is any Std. Report available for this requirement ?
If not is there any std. report available which can use as a base to derive a development?
For. Ex. I have a prod. order of 100 Nos. out of which 85 nos are confirmed, by the timings in routing it should take 20hrs to produce 85 nos but while confirming the time ticket, end user has entered 25hrs. So I want to know the why this extra timings are taken ? Is there any justified reason for that 5 hrs, viz. m/c breakdown, power failure, material shortage.
If possible this can be done with a summary of the orders on a specific date and for a specific plant.
Hi
For your requirement COOIS will not give full information
Please go for customised Z report
Regards
Ranga
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check COOIS This is a standard production information system where u can configure ur own layouts..
Thanks & Regards,,
Irshad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Mr.Umesh,
Check with T code - COOIS - Production Order
Information system.
Give the Production orders or the order type,plant.
After executing ,click on Change Layout (which's next to
download button,include or exclude the fields which you
want to get displayed.
<u>Reward points if useful.</u>
Regards
Mangal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.