Summarized Plannned Vs Actual Qty Report

Hi all,

From the Production perspective, I need a report from the system which contains following fields,

1 Order

2 Planned prod. Qty

3 Actual Prod Qty

4 Planned time reqd.

5 Actual time reqd.

6 Variance between time reqd.

First is any Std. Report available for this requirement ?

If not is there any std. report available which can use as a base to derive a development?

For. Ex. I have a prod. order of 100 Nos. out of which 85 nos are confirmed, by the timings in routing it should take 20hrs to produce 85 nos but while confirming the time ticket, end user has entered 25hrs. So I want to know the why this extra timings are taken ? Is there any justified reason for that 5 hrs, viz. m/c breakdown, power failure, material shortage.

If possible this can be done with a summary of the orders on a specific date and for a specific plant.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Aug 20, 2007 at 01:29 PM

    Dear Mr.Umesh,

    Check with T code - COOIS - Production Order

    Information system.

    Give the Production orders or the order type,plant.

    After executing ,click on Change Layout (which's next to

    download button,include or exclude the fields which you

    want to get displayed.

    <u>Reward points if useful.</u>

    Regards

    Mangal

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 20, 2007 at 01:29 PM

    Hi,

    Check COOIS This is a standard production information system where u can configure ur own layouts..

    Thanks & Regards,,

    Irshad

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 20, 2007 at 03:02 PM

    Hi

    For your requirement COOIS will not give full information

    Please go for customised Z report

    Regards

    Ranga