storage location issue MRP 2 & MRP4 in MRP

Hi Friends,

In MRP 4 view storage location MRP inicator set to 1 "Storage location stock excluded from MRP" ,In MRP 2 view Prod storage location also entered.

we are using stratgy 11 gross requirement planning for (finshed it will not stores stock in to account)

but componenets i have set MRP indicator 1. in MRP 4 view

But my problem is MRP not generating planned orders for components.only it will give depedent requirements. what could be the reasons?

If i remove Prod storage location from MRP 2 view system will generate planned orders.

Regards

Sandeep

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • avatar image
    Former Member
    Aug 18, 2007 at 02:09 PM

    Hi sandeep,

    Please check the stock(max.qty may be set in material master).If it exceeds the reqd. qty, planned order will not be generated even after mrp run.Also check the strategy set in finished component.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 20, 2007 at 05:05 AM

    Hi sandeep,

    please check for what storage location dept requirements have created..

    since the u have set ind=1, that specific storage location will not be included in MRP run, so procurement proposal will not be created.

    if u want get procurement proposal means, extend that component for one more storage location and give it as prod stor loc in MRP view, then run the MRP.

    so the procuremen proposal will be created for all other storage locations except that storage location excluded from MRP.

    i hope, your doubt is clear... reward points if its useful

    regards

    pradeep

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 20, 2007 at 06:46 AM

    Hi Sandeep,

    in MM02 goto MRP3 view and give Mixed MRP "2" and remove indicator "1" from mrp 4 view

    it will solve your problem

    Thanks

    Bala

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 20, 2007 at 07:17 AM

    Sandeep,

    What is the MRP type used for the components? Also what is the reason for excluding that Sloc from MRP? Is it were the demand is created for?

    Above answers will help..

    Regards,

    Prasobh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 20, 2007 at 08:08 AM

    Dear Sandeep.

    Since you maintained indicator 1 in MRP4 view with storage loc lets say X as a org element, system will not consider the requirement in X for MRP to generate the planned order or purchase req. But however it will only show the dependent requirement from its parent BOM's.

    With setting 1 you need to plan manually.

    Solution I am proposing is as below-

    Now if you want system to create the PR, then you need to set the indicator as 2 and run MRP for that material, in which case it will create PR if the stock is below reorder point qty / replenishment qty what you entered in the MRP 4 view.

    I hope this will work for you.

    Please let me know if you are okay.

    Rajesha vittal