cancel
Showing results for 
Search instead for 
Did you mean: 

RFC execution

Former Member
0 Kudos

Hi,

In my model I am using the RFC enabled FM K_PERIODS_GET_DATE_KOKRS

to calculate the fiscal year/period. It works fine for me in the Dev and QA environments but in the Production environment, I get undefined/undefined output instead of 004/2008 output.

Would have something to do with the roles on the R/3 side in Production? As i can run that function module in R/3 production.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Check the input via external breakpoints. I think it could be possible that the input value is not correct. Also check the system alias.

Best Regards,

Marcel

Former Member
0 Kudos

But it works for the Basis person and not for anyone else

Former Member
0 Kudos

Check the permissions of the other persons.

Best Regards,

Marcel

former_member209575
Contributor
0 Kudos

Hi karan

sometimes some objects are missing during transportation. check it..

Regards

Pradeep P N