on 08-17-2007 12:40 PM
Hi
We have two ECC6 system.
One(BP system) has got BPERP05 600V5 and BP-INSTASS 600V1 components along with SAP best practices v1.6 for CHEMICALS installed on it.
Other system (non BP system) is a non best practices system and does NOT have BPERP05 and BP-INSTASS installed.
Our config team carried out the configuration and changes to BP CHEM system(which has best practices for Chemicals and BP components) according to their needs. They created the transports for that and released them.
We are not sure whether those transports can be imported Successfully into our production which is Non BP system( which does not have best practices nor BP system components installed).
Also what issues do you foresee if we carry out the imports.
any help will be highly appreciable
Thanks a lot.
Jasanant Singh
Jaswant Singh,
I have same issue, I also want to do same thing but did not get correct answer yet. Do you receive any answer on this issue yet?
Mahesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
8 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.