cancel
Showing results for 
Search instead for 
Did you mean: 

How planning strategy 50 works?

Former Member
0 Kudos

Hello

For one finished goods, I set it's planning stratety as 50, create it's BOM with two component, and set component's planning stratety as 10.

As planning stratety 50 features, before sales order of finished goods dropping, assembly stock should be ready, so, if we can understand in this way, when sales order is dropping, and MRP running:

for finished goods, planned order for finished goods is generated and reduce original VP planned order;

for assembly, suppose there is no dependent requirement generated. But in my testing case, stock of assembly is enough, but dependent requirement is also generated. It's conflict with planning stratety 50.

I think maybe I made a wrong setting for assembly in material master, I set assembly's planning strategy as 10.

Who can help me to fix this issue? I want a result that when assembly stock is enough, no dependent requirement generated for assembly.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Nicole,

With planning strategy 50 u will get a planned order for Fg when MRp is run but this planned order is not convertible. The planned orders for SFG can be converted if u have setting in MRp 4 view - ind/coll reqt as 2.

Only when a Sales order comes then the VP planned order qty gets reduced by the sales order qty and another plnd order created for the sales order qty which can be connverted and FG stocked to Warehouse.

Also, if u maintain Plng strategy for FG as 50 and for child 30 , FG plng strategy takes precedence even though u have specified plng strategy for child.So the plng strategy for the product is 50 only.

Thanks and regards,

Rajesh

Former Member
0 Kudos

Hi,

please check have you maitained Individual/coll. indicator = 2 for the assemply at MRP View in material Master...

regards

pradeep

Former Member
0 Kudos

Hi Nicole,

instead of 10 use 40 for component items

or

For component , in MRP4 view try using ind/col in MRP4 view "2"

Thanks

Bala

Former Member
0 Kudos

Hello All

I set ind/col in MRP4 view as '2' and planning strategy as 70 for component, now, it's fine, dependent requirement generated for SFG and after MRP fun, the dep.req consume stock instead of generating planned order when stock is enough, it's as expected.

Thanks all.