cancel
Showing results for 
Search instead for 
Did you mean: 

System Copy from High-Availibilty

Former Member
0 Kudos

We are running SAP in high-availability on a MS SQL 2005 cluster.

We are going to be setting up a disaster recovery cluster.

Has anyone had experience doing a system copy where the source/target systems are a MSCS cluster with Win2003 SP1 nodes and SQL 2005 db?

Any tips, tricks, or pointer would be appreciated.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member433984
Active Contributor
0 Kudos

some details are missing?

- what is the SAP release?

- is this abap/java system or mixed?

Former Member
0 Kudos

- ECC 6.0 (MySAP Business Suite)

- Mixed abap/java

former_member433984
Active Contributor
0 Kudos

ok. This is should be done as homogeneous system copy

see docu "System Copy for SAP Systems Based on 7.0 SR1 ABAP+Java " on

http://service.sap.com /instguides

go for SAP NetWeaver 7.0 (2004s) -> Installation

you can use both - r3load and db copy methods. Details are in docu.

best regards