Hello ,
there is no such feature in the subcontracting to have multilevel BOM, you can have two options in this case
1) attach the BOM as DOCument in the PO for the relevant component
2) add the relevant component in same order with deliver to same vendor as subcontractor with BOM.( take a trial not tested)
thanks
kUnal
When the subcontracted manufacturing requirement is complex enough to require a multi-level BOM, it is better to go with a Production Order with External Processing rather than a Purchase Order.