Skip to Content
0

Issue with /CPMB/TRIGGER_BW_CHAIN

Aug 10, 2017 at 04:32 AM

40

avatar image
Former Member

Hello Experts,

I am working in support project. Some one has created BW process chain to load master data from ECC->BW->BPC and then running this process chain using data manager package based on /CPMB/TRIGGER_BW_CHAIN process chain.

Package status is successful Once they trigger this data manager package from front end(EPM). However master data is not updating in BPC.

have also added a process variant based on BPCCLEAR with the required parameters (IFCHAINCLOSE=Y;CLOSE_MODE=1) at the end of the BW Process Chain.

Will it possible to load data from ECC->BW->BPC with one step?

Kindly advice.

Thanks in advance.


10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Scott Raines Aug 16, 2017 at 02:29 PM
0

You need to look closely at those last two steps in the happy path that are program executions claiming to load the data to BPC. These appear like they might be custom programs designed to load the data to the BPC cube(s). That would be my first step. Figure out what those are and what they are doing. Second...does the data load in successfully if you run the data manager package manually?

Good luck!

Share
10 |10000 characters needed characters left characters exceeded